
Advanced thermo treatment gear, this sort of as network heat treatment method oven, multi-use thermo remedy oven, and so on. a specialized provider of a total range of chains, sprockets, gears, equipment racks, V-belts, couplings and reducers. We can offer a entire-selection of energy transmission items like chains, sprockets and plate wheels, pulleys, gearboxes, motors, couplings, gears and racks. Workshop Use Electric EPTT GirEPTTBridge Crane
Element one colon Description and Application
EPTT GirEPTTOverhead Cranes give a better heigEPTT of raise in presented headroom as the hook travels in between the beams interval With open winch trolley as its lifting system comma they are accessible in increased capacities than solitary girEPTTand for large responsibility purposes period of time
Overhead Cranes are available with a large selection of personalized choices in capacities up to 700t and span up to 60m comma assisting with all reliable material managing remedies interval Our crane gives an exceptional all round worth period of time
They are also cab be Custom Designed for serious purposes and severe environments period of time
Portion two colon Thorough Configuration colon
Workshop Use Electric powered EPTT GirEPTTBridge Crane
1- EPTT Mechanism
-open up winch trolley blended with motor comma EPTT comma EPTT brake comma drum comma hook comma sheaves comma coupling comma brake drum and so on period of time
-Rigid box variety trolley body
– Wound Rotor 3-section asynchronous motor
– Harden Teeth EPTT
– EPTT Drum Brake
-Plate-rolled Drum kits
2-End Carriages
-Solid Flanged wheel
-Rigid welded box variety beam
-compact layout
three-Griders
-2 major girders are welded box sort
-EPTT colon carbon metal with substantial high quality of Q235B or Q345B
-The major girEPTTis connected by energy bolt period of time
-Weld joint tested by X ray or ultrasonic assessment semi
– Modula design and style
– Designed Deflection le1 sol800 of span
4-Control
-Cabin handle
-Unbiased pendent manage as selection
-Wireless management as selection
5-Electrical Element
-Conductor EPTT provide
-All hoist and crane movements are unbiased and can be run EPTTltaneously interval
-Security diploma IP55
-The parts are positioned in a maintenance helpful way comma and the EPTT layout offers with excellent protection
-Festoon cables are suspended on cable saddles comma mounted to cable trolleys comma working in a galvanized C-keep track of interval
six-Portray
-corrosion defense through rust elimination by mechanical shot blasting SA two period5
-First layer of coating epoxy thirty microns
-Second layer of coating epoxy thirty microns
-Third Layer of coating of polyurethane 40 microns
-Average thickness colon about a hundred microns
-Coloration colon yellow or Orange as for every specifications
seven-Protected Security
-Emergency-off change
-Overload shield
-Earth security
-Zero Placement Defense
-Cross journey and EPTT travel safety
-EPTT vacation protection
-Overheating defense of motor
-Equipped with rainproof products
– Alarm Bell and Lamp
Element 3 colon Sketch amp EPTT Data
Workshop Use Electric EPTT GirEPTTBridge Crane
| EPTT ability | t | sixteen sol3 period2 | ||||||||||
| Span | m | ten period5 | 13 period5 | 16 period5 | 19 period5 | 22 period5 | twenty five period5 | 28 period5 | 31 period5 | |||
| Max period of time EPTT height | Major hook | 16 | ||||||||||
| AuXiHu (West Lake) Dis.liary hook | 18 | |||||||||||
| Pace | EPTTing | Major | A5 | m solmin | 7 period9 | |||||||
| A6 | thirteen | |||||||||||
| AuXiHu (West Lake) Dis.liary | fourteen period5 | |||||||||||
| trolley travelling | forty four period6 | |||||||||||
| crane travelling | A5 | eighty four period7 | 87 period6 | |||||||||
| A6 | 112 period5 | one hundred and one period4 | ||||||||||
| EPTT | EPTTing | Major | A5 | Kind solKw | YZR225M-8 sol26 | |||||||
| A6 | YZR250M1-six sol37 | |||||||||||
| AuXiHu (West Lake) Dis.liary | YZR160M2-6 sol8 period5 | |||||||||||
| trolley travelling | YZR132M2-six sol4 | |||||||||||
| crane travelling | A5 | YZR160M1-6 sol6 period3 | YZR160M2-six sol8 period5 | |||||||||
| A6 | YZR160M2-six sol7 period5 | YZR160L-six sol11 | ||||||||||
| Proportions lparmm rpar | A5 | B | 5864 | 5928 | 6348 | |||||||
| V | 4000 | 4100 | 5000 | |||||||||
| S1 | 1040 | |||||||||||
| S2 | 1850 | |||||||||||
| S3 | 1500 | |||||||||||
| S4 | 2310 | |||||||||||
| b | 230 | 260 | ||||||||||
| L | 2000 | |||||||||||
| E | 2400 | |||||||||||
| H | 2095 | 2185 | ||||||||||
| H1 | 815 plusH0 | 905 plusH0 | ||||||||||
| H2 | eighty | a hundred and eighty | 240 | 388 | 583 | 688 | 838 | |||||
| H3 | 2500 | 2600 | 2660 | 2808 | 2958 | 3108 | 3258 | |||||
| H4 | 729 | 639 | ||||||||||
| H5 | 770 | |||||||||||
| A6 | B | 6278 | 6188 | 6798 | ||||||||
| V | 4400 | 5000 | ||||||||||
| S1 | 1040 lpar1100 rpar | |||||||||||
| S2 | 1850 lpar1910 rpar | |||||||||||
| S3 | 1500 | |||||||||||
| S4 | 2310 | |||||||||||
| b | 230 | 260 | ||||||||||
| L | 2000 pm2 | |||||||||||
| E | 2400 | |||||||||||
| H | 2095 | 2097 | 2187 | 2185 | ||||||||
| H1 | 815 pmH0 | 940 pmH0 | ||||||||||
| H2 | 80 | 180 | 240 | 390 | 540 | 690 | 840 | |||||
| H3 | 2500 | 2600 | 2660 | 2810 | 3960 | 3110 | 3260 | |||||
| H4 | 729 | 727 | 637 | 639 | ||||||||
| H5 | 770 | |||||||||||
| Weight | trolley | A5 | Kg | 6400 | ||||||||
| A6 | 6640 | |||||||||||
| overall excess weight | A5 | 18416 | 19837 | 22828 | 26054 | 28477 | 32566 | 36138 | 39161 | |||
| A6 | 19439 | 21087 | 23317 | 27717 | 35714 | 34155 | 37707 | 41096 | ||||
| Max period of time wheel load | A5 | KN | one hundred forty | 148 | 154 | 168 | a hundred seventy five | 187 | 196 | 205 | ||
| A6 | 145 | 152 | a hundred and sixty | 172 | one hundred eighty | 191 | 201 | 211 | ||||
| Steel track | 43kg solm or Qu70 | |||||||||||
| EPTT supply | 3-Stage A periodC interval 380V 50Hz | |||||||||||

